Skip to content

       

Construction & Restoration

What to Expect

Work typically occurs in three parallel tracks:

Borefield drilling (in parking lots or designated sites)

Installing the shared geothermal piping mains and service connections along streets

Water source heat pump

In‑home equipment conversions for participants

Completed Work

In August and September 2026, Xcel Energy conducted geothermal test-borehole work at the Frisco Town Hall parking lot. The work supported engineering and feasibility evaluation for the demonstration project.

Construction schedules, traffic-control information, and restoration updates will be posted as future work is planned.

Restoration Approach

Pavement, sidewalks, and landscaping disturbed by construction will be restored. In snow‑prone areas, final surface restoration may be scheduled for shoulder seasons as conditions allow.

Xcel Energy logo

© 2026 Xcel Energy Inc. All rights reserved.
Some photos and illustrations provided by HEET.

Denver Climate Action Sustainability and Resiliency logo